Certified Energy Manager Exam Flashcard Study System Cem Test Practice Questions Review For The Certified Energy Manager Exam Cards – Verified Source

Note: Power factor (0.85) not needed for kW calculation — only for kVA. Term: Chilled Water Reset Card 4 – Back A: A control strategy that increases chilled water supply temperature as cooling load decreases (e.g., from 44°F to 50°F at part load).

Note: For CEM exam, know how to compare NPV of two mutually exclusive projects. What is the primary purpose of a Measurement & Verification (M&V) Plan (IPMVP Option A or B)? Card 7 – Back A: To quantify actual energy savings from an ECM (Energy Conservation Measure) by comparing measured post-retrofit energy use to a baseline adjusted for relevant variables (weather, occupancy, production). Note: Power factor (0

Isolated retrofit, stipulated assumption for unmeasured factors. Option B: All parameters measured. Card 8 – Front True or False: Power factor correction capacitors reduce kW demand charges. Card 8 – Back A: False. Capacitors reduce kvar , thus lowering kVA (apparent power), which may reduce kVA demand charges , but not kW demand. kW is real power, unchanged by capacitors. What is the primary purpose of a Measurement

Note: May produce multiple values for non-conventional cash flows. Which ASHRAE Standard defines energy baseline and modeling for commercial buildings? Card 12 – Back A: ASHRAE Standard 90.1 (Energy Standard for Buildings Except Low-Rise Residential) — particularly Appendix G for Performance Rating Method. Option B: All parameters measured

Boxed set of 300+ double-sided flashcards, plus quick-reference tabs and online access code. System Introduction (Printed on inside cover of card box) Welcome to the most effective rapid-review system for the CEM Exam, administered by the Association of Energy Engineers (AEE). This flashcard system is designed to condense the 5 key CEM exam bodies of knowledge— Energy Accounting & Economics, Energy Audits & Instrumentation, Electrical Systems, HVAC & Thermal Systems, and Building Envelope & Lighting —into high-yield, portable study cards.

The effective annual return from the project’s cash flows. Compare to company’s hurdle rate (e.g., 12%). If IRR > hurdle rate → accept.